Quatech Audio/Video Capture USB 2.0 Specifikace Strana 96

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 404
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 95
6
6-18 z.one ultra and z.one ultra sp OPERATOR MANUAL
Figure 6-18. Typical Leakage Tester Setup
Leakage Test Setup
1. Fill soak tray or container that will be used for leakage tester with appropriate
solution.
2. Connect dual conductivity transducer and adapter to the leakage tester.
3. Connect transducer to the adapter.
4. You can choose to use batteries or the AC adapter on the leakage tester. If
using AC adapter plug this into the leakage tester.
5. Insert the transducer into the soak tray being careful not to go past the 100cm
mark. Avoid having liquid go past the 100cm mark as this can damage the
transducer electronics. The flexible shaft must be immersed at least to the
75cm mark to pass the minimum leakage current level.
6. The dual conductivity electrodes must be immersed into the soaking solution.
7. Power on the tester.
8. Verify that the display indicates Zonare:TEE 230
9. Press the Full Test button
10. The transducer is safe for use if the test window reads Test Passed.
11. If the test window says Test Failed, check the connections on the leakage set
up and try testing again. See
Figure 6-18 for proper connections to the
leakage tester.
12. If the transducer is still registering Test Failed, check the transducer for
damage and do not use on patients.
13. Contact ZONARE service (1-877-913-9663) for advice on how to further test
the transducer or send it in for repairs.
Dual
Conductivity
Probe
Transducer
Adapter
Leakage
Tester
Zobrazit stránku 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 403 404

Komentáře k této Příručce

Žádné komentáře